Fengshan Community Centre Renovation

project details

Main Contractor : Front Build Engineering Construction Pte Ltd
Window Contractor : Front Build Engineering Construction Pte Ltd
Scope of Work: 1. Door & Window installation 2. Louvre installation 3. Water testing 4. Cleaning, defect rectification and handover

About Project

Project Name: 
Proposed Additions and Alterations with Addition of New 1-Storey to Existing 3-Storey Fengshan Community Club on Lot 06779T MK 27 at 20 Bedok North Street 2 (Beodk Planning Area)

Project Details:
ATM Engineering was responsible for installing doors, windows, and louvres for the Fengshan Community Centre, a key project in a local redevelopment plan. We worked with Front Build Engineering to ensure the installation was precise and met both functional and aesthetic requirements. After the installations, we performed water testing and defect rectification, ensuring that everything was in top condition before the final handover.