PCS
project details
Client:
PCS
Project Duration :
Aug 2021 - Oct 2021
Main Contractor:
A+ Engineering Pte Ltd
Client Location:
Jurong Island
Scope of Work:
Gasket Replacement and Underground Piping Modification
About Project
As part of a planned shutdown, ATM Engineering performed essential maintenance tasks, including the replacement of gaskets and the modification of underground piping. These upgrades were critical for improving the plant’s efficiency and ensuring its continued operational safety. The scope also included testing to verify that all systems were functioning optimally after the repairs. Our team worked under tight schedules to minimize downtime and ensure a smooth transition back to production.
Previous